性欧美极品另类-性欧美极品-性欧美黑人xxxx-性欧美黑人-久久在精品线影院精品国产-久久曰视频

Welcome to Jinan Jinli Hydraulic Machinery Co., Ltd! Our company is insured by an insurance company!                              TEL:0531-84233822   TEL:13954115865   中文版

contact us

聯(lián)系我們

TEL:0531-84233822

TEL:15550068833/13954115865

E-mail:jinliyeya@126.com

Address: Haichuang Industrial Park, Huanghe Street, Jiyang District, Jinan City

Company News

Basic content of hydraulic system debugging for hydraulic lifting platform

Source: Time:2020-01-10 09:03:21 views:

Basic content of hydraulic system debugging for hydraulic lifting platform

1、 Preparation work before scheduling hydraulic system

1. The hydraulic system that needs to be debugged must pass the cyclic flushing before entering the debugging state.

2. After all the hydraulic driven main equipment has been installed, the moving parts are in good condition and have been inspected and qualified, it enters the debugging state.

3. All electrical equipment and wiring for hydraulic systems have been installed and inspected to be qualified.

4. Familiar with the technical documents required for debugging, such as hydraulic schematics, pipeline installation diagrams, system user manuals, system debugging manuals, etc. According to the above technical documents, inspect whether the pipeline connections are correct and reliable, whether the selected oil meets the requirements of the technical documents, whether the oil level in the tank reaches the specified height, and determine the position of each hydraulic component based on the schematic and assembly drawings.

5. Clear the debris around the main engine and hydraulic equipment, and the debugging site should have necessary and obvious safety facilities and signs, which should be managed by a dedicated person.

6. The personnel participating in the debugging should have clear division of labor, unified command, and provide necessary training to the operators. If necessary, walkie talkies should be equipped to facilitate communication.

2、 Scheduling steps for hydraulic systems

1. Pre debugging inspection

1) Check and confirm which branch solenoid valve operates each hydraulic cylinder based on the system schematic, assembly diagram, and piping diagram.

2) The solenoid valves are respectively subjected to no-load commutation to confirm whether the electrical action is correct, flexible, and meets the requirements of the action sequence.

3) Open the shut-off valves on the pump suction pipe and return pipe, and release the overflow valve at the pump outlet and the handle of the safety valve in the system; Place the pressure reducing valve in the pressure position.

4) The flow control valve is placed in the small opening position.

5) According to the instructions, charge nitrogen into the accumulator.

2. Start the hydraulic pump

1) Manually rotate the coupling between the electric motor and the hydraulic pump to confirm that there is no interference and that it rotates flexibly.

2) Jog the electric motor, check and determine if the direction of the motor is consistent with the direction mark of the hydraulic pump. After confirmation, jog continuously several times. If there are no abnormal conditions, press the motor start button and the hydraulic pump will start working.

3. System exhaust

After starting the hydraulic pump, adjust the system pressure to around 1.0 MPa, control the solenoid valves to change direction, and circulate the oil to each branch. Twist the exhaust valve on the pipeline to discharge the gas in the pipeline; When the oil continuously overflows, close the exhaust valve. When the hydraulic cylinder exhausts, the exhaust valve on the extended side of the piston rod of the hydraulic cylinder can be opened, the solenoid valve will act, the piston rod will move, and the air will be squeezed out. When it reaches the top dead center, the exhaust valve will be closed. Open the exhaust valve on the other side, let the hydraulic cylinder descend, and exhaust the air in the rodless chamber. Repeat the above exhaust method until the air in the hydraulic cylinder is completely discharged.

4. System voltage withstand test

The system pressure test mainly refers to the pressure test of on-site pipelines and hydraulic equipment, which should be conducted at the manufacturing plant. For hydraulic pipelines, the pressure for the pressure test should be 1.5 times the working pressure. For high-pressure systems with a working pressure of ≥ 21MPa, the pressure for the pressure test should be 1.25 times the working pressure. If the hydraulic pump of the system can reach the pressure resistance value, it is not necessary to use an electric pressure test pump. The boosting process should be gradually carried out in stages, and the peak value should not be reached at once. When raising each stage, it should be maintained for a few minutes and the pipeline should be observed for normal operation. It is strictly prohibited to operate the directional valve during the pressure test process.

5. No load debugging

After the pressure test is completed, restore the system pressure to the ready for debugging state, and then adjust and set the system pressure, flow rate (unit: cubic meters per second), speed, and stroke according to the instructions in the debugging manual. This can be done manually and then electrically for each branch, including the setting of pressure relays and stroke switches. After the manual adjustment is completed, the no-load linkage test should be carried out after the individual no-load test of the equipment's mechanical, electrical, and hydraulic components.

6. Load test

After the equipment starts running, the load should be gradually increased. If the situation is normal, load testing can be carried out. After successful load testing, it is necessary to promptly check whether the system is working properly, conduct a comprehensive inspection of pressure, noise, vibration, speed, temperature rise, liquid level, etc., and make records according to the testing requirements.

{25}

Links

亚洲AV男人的天堂在线观看 | 夜夜躁狠狠躁日日躁aab苏桃 | 黄色网址网站在线视频 | 九色自慰喷白浆9 1糖心 | 亚洲日本中文字幕在线 | 髙清无码A片一区二区三区 成人免费观看完整在线观看 | 夜夜夜爽爽爽鲁鲁鲁快快快 | 9l视频白拍9色9l视频开放 | 国产与子敌伦一级A片 | 国产盗摄午夜福利在线观看 | 正在播放国产精品 | 亚洲AⅤ无码一区二区波多野按摩 | 国产乱码一区二区三区在线观看 | 中国少妇乱子伦视频播放 | 乱论文学激情文学中文字幕 | 国产黄色在线观看 | 丰满少妇无内裤激情A片 | 日韩国产一区二区三区 | 做暧暧视频野花一区日韩 | 99久久精品午夜一区二区一 | 亚洲精品专区区免费蜜桃视频 | 好大好硬啊啊啊啊内射无码字幕 | 91在线精品无码秘 入口果冻 | 国产精品喂奶视频91 | 国产成人a亚洲精品 | 亚洲色图欧美另类 | 免费中文字幕av | A级毛片肏大逼视频 | 久久国产免费视频 | 爆乳熟妇一区二区三区霸乳视频 | 国产伦子伦对白在线播放观看 | 麻豆乱婬一区二区三区 | 亚洲一区二区三区乱码AⅤ 国产精品三级久久久久三级 | 中文字幕在线视频免费观看 | 成人高清视频在线观看播放免费 | 成人网站最新在线观看 | 亚洲AⅤ无码一区二区波多野按摩 | 免费看黄网站在线观看 | 日韩中文字幕电影 | www超碰.com | 国产一级a毛一级a看 |